Wacker DriveWells Street Bridge Donovan Bridge I-74 ReconstructionAnimal Bridge Historic RR Bridge Study

Wacker Drive Reconstruction
Chicago, Illinois
JLA worked closely with large engineering firms, the City of Chicago, and state preservation officials to guide the preservation component of this complex reconstruction project. Rehabilitation of the 74-year-old roadway viaduct was necessary to bring it into compliance with modern codes. Preservation scope, established through close coordination with state preservation officials, included historic documentation, removal and re-mounting of original cladding onto the new roadway structure, and cleaning and repairs of cladding, stairways, light fixtures, and ironwork. Deteriorated elements, such as stone balustrades, were reconstructed based on their original forms.
Awards:
• AIA Chicago Honor Award
• Illinois Engineering Council Outstanding Engineering Achievement Award
Services:
• Historic Documentation (HAER) & Section 106 Review
• Construction Documents
• Construction Administration
